Proceedings: NCBC 2007 - Chicago, IL

| Home | Author | Title | Session |

Browse by Title

Click paper title to view/download PDF.
Tip: Use your browser's page-search feature to find names or keywords.
Note: File size shown (like this) if larger than 500KB.

Kent Barber An AE/CxA Team Approach to Specifying Control Systems Logic and Integration
Trina Larsen Commissioning Advanced Lighting Systems
Ray Dodd Commissioning as Evidence in Litigation: Are you ready to take the stand?
Ken Toombs Commissioning Hospital Construction
Roy H. Feinzig Commissioning Humidity Control Systems in Critical Environments
Vincent Pratt Commissioning Repetitive Floors in a High-Rise Office Building
Michael C. Rosenberg Commissioning the ABSL-3 Laboratory
John A. Lopez Commissioning to Support the Shutdown, Decontamination and Restart of an ABSL3 Facility
Daniel J. Lemieux Commissioning Under the Influence…Redefining the Traditional Role of the Commissioning Agent in the Design and Construction of the Building Envelope
Scott D. Williams Construction Document Changes to Improve Constructability
Peter C. D'Antonio Costs and Benefits of Commissioning LEED-NC™ Buildings
Edward P. Rafter The Data Center Tier Performance Standards and Their Importance to the Owner’s Project Requirements
Kenneth L. Gillespie Developing a Design Review Tool for Use in the Commissioning Process
Masato Miyata Development of a Simulation Tool for the Commissioning of a HVAC system with Seasonal Thermal Storage (500KB)
Lia Webster Effects of Project Screening Criteria on RCx Energy Savings
Tony Martin Elements of Commissioning Architectural Systems
Bob Romo Energy Efficiency in Chicago's Community
Oliver Baumann Energy Saving Concept for 1,000 Buildings of the ‘Landeshauptstadt München,’ Germany
Joseph Clair Evolution of Commissioning at the Chicago Public Schools: from Concept to Commitment
Charles E. Dorgan Guideline 1-2007: HVAC&R Technical Requirements for The Commissioning Process
Joseph J. Deringer Guideline 3-2006: Exterior Enclosure Technical Requirements for The Commissioning Process
Alfred E. Turnbull Increasing the Effectiveness of a Commissioning Project
Joseph J. Deringer Making Daylighting Work: Applying Cx to Improve the Design and Implementation Process
Rick Lasser Making LEED® Work for You
Bradley Brooks No Operator Left Behind: Effective Methods of Training Building Operators
George Oberlander, Jr. The Nuts and Bolts of the Commissioning Process
Bill Gnerre Pay Now or Pay Forever: Commissioning the Design of Control System Software
Mike Eardley Persistence Tracking in a Retro-commissioning Program
Russ Chitwood Practical M&V for Recommissioning Projects
Michael L. Weiss Project Programming and Commissioning as a Risk Mitigation and Threat Analysis Tool
Jeffrey S. Willis Putting on Your Game Face (Preparation Begins with Predesign)
Michael K. J. Anderson Quantifying Monitoring-Based Commissioning in Campus Buildings: Utility Partnership Program Results, Lessons Learned, and Future Potential
Narendra Amarnani

Retro-commissioning (RCx) Sustainable Savings: Are We There Yet? (1081KB)

Kimberlie A. Lenihan Retro-Commissioning for Peak Electric Demand Reduction in New York City
Tracy Phillips Retrocommissioning Investigation Study of the Sheraton Chicago Hotel & Towers Cityfront Center
Peter Keithly Retro-Commissioning Phase I Demonstration Project: Shanghai, China
G. Trevor Powers Strategies in Commissioning for Bio-Safety
David Jump Tracking the Benefits of Retro-Commissioning: M&V Results from Two Buildings (909KB)
James I. Magee Training Commissioning Technicians
Mike English Underfloor Air Distribution in a Commercial High Rise: The New York Times Headquarters
Ron Wilkinson The University of Medicine and Dentistry of New Jersey Makes Commissioning Business as Usual

Top of page