Click paper title to view/download PDF.
Tip: Use your browser's page-search feature
to find names or keywords.
Note: File size shown (like
this) if larger than 500KB.
| Amarnani, Narendra |
Retro-commissioning (RCx) Sustainable Savings: Are We There Yet? (1081KB) |
| Anderson, Michael K. J. |
Quantifying Monitoring-Based Commissioning in Campus Buildings: Utility Partnership Program Results, Lessons Learned, and Future Potential |
| Barber, Kent |
An AE/CxA Team Approach to Specifying Control Systems Logic and Integration |
| Baumann, Oliver |
Energy Saving Concept for 1,000 Buildings of the ‘Landeshauptstadt München,’ Germany |
| Brooks, Bradley |
No Operator Left Behind: Effective Methods of Training Building Operators |
| Chitwood, Russ |
Practical M&V for Recommissioning Projects |
| Clair, Joseph |
Evolution of Commissioning at the Chicago Public Schools: from Concept to Commitment |
| D'Antonio, Peter C. |
Costs and Benefits of Commissioning LEED-NC™ Buildings |
| Deringer, Joseph J. |
Guideline 3-2006: Exterior Enclosure Technical Requirements for The Commissioning Process |
| Deringer, Joseph J. |
Making Daylighting Work: Applying Cx to Improve the Design and Implementation Process |
| Dodd, Ray |
Commissioning as Evidence in Litigation: Are you ready to take the stand? |
| Dorgan, Charles E. |
Guideline 1-2007: HVAC&R Technical Requirements for The Commissioning Process |
| Eardley, Mike |
Persistence Tracking in a Retro-commissioning Program |
| English, Mike |
Underfloor Air Distribution in a Commercial High Rise: The New York Times Headquarters |
| Feinzig, Roy H. |
Commissioning Humidity Control Systems in Critical Environments |
| Gillespie, Kenneth L. |
Developing a Design Review Tool for Use in the Commissioning Process |
| Gnerre, Bill |
Pay Now or Pay Forever: Commissioning the Design of Control System Software |
| Jump, David |
Tracking the Benefits of Retro-Commissioning: M&V Results from Two Buildings (909KB) |
| Keithly, Peter |
Retro-Commissioning Phase I Demonstration Project: Shanghai, China |
| Larsen, Trina |
Commissioning Advanced Lighting Systems |
| Lasser, Rick |
Making LEED® Work for You |
| Lemieux, Daniel J. |
Commissioning Under the Influence…Redefining the Traditional Role of the Commissioning Agent in the Design and Construction of the Building Envelope |
| Lenihan, Kimberlie A. |
Retro-Commissioning for Peak Electric Demand Reduction in New York City |
| Lopez, John A. |
Commissioning to Support the Shutdown, Decontamination and Restart of an ABSL3 Facility |
| Magee, James I. |
Training Commissioning Technicians |
| Martin, Tony |
Elements of Commissioning Architectural Systems |
| Miyata, Masato |
Development of a Simulation Tool for the Commissioning of a HVAC system with Seasonal Thermal Storage (500KB) |
| Oberlander, Jr., George |
The Nuts and Bolts of the Commissioning Process |
| Phillips, Tracy |
Retrocommissioning Investigation Study of the Sheraton Chicago Hotel & Towers Cityfront Center |
| Powers, G. Trevor |
Strategies in Commissioning for Bio-Safety |
| Pratt, Vincent |
Commissioning Repetitive Floors in a High-Rise Office Building |
| Rafter, Edward P. |
The Data Center Tier Performance Standards and Their Importance to the Owner’s Project Requirements |
| Romo, Bob |
Energy Efficiency in Chicago's Community |
| Rosenberg, Michael C. |
Commissioning the ABSL-3 Laboratory |
| Toombs, Ken |
Commissioning Hospital Construction |
| Turnbull, Alfred E. |
Increasing the Effectiveness of a Commissioning Project |
| Webster, Lia |
Effects of Project Screening Criteria on RCx Energy Savings |
| Weiss, Michael L. |
Project Programming and Commissioning as a Risk Mitigation and Threat Analysis Tool |
| Wilkinson, Ron |
The University of Medicine and Dentistry of New Jersey Makes Commissioning Business as Usual |
| Williams, Scott D. |
Construction Document Changes to Improve Constructability |
| Willis, Jeffrey S. |
Putting on Your Game Face (Preparation Begins with Predesign) |